Intermediate
Wood_floors

Install or Replace Flooring (LVP / Laminate)

Install luxury vinyl plank or laminate click-lock flooring over any existing subfloor, including prep, cutting, and finishing.

1-2 days per room
8 steps

Tools Needed

Tape measurePull barTapping blockRubber malletJigsaw or circular sawSpacersUnderlaymentUtility knife

Find Materials Near You

Tap a store to find the nearest location on Google Maps.

Instructions

1

Prep the Subfloor

The subfloor must be flat within 3/16 inch per 10 feet. Fill low spots with floor leveling compound. Remove high spots by sanding. Remove baseboards.

2

Acclimate the Flooring

Leave planks in the room for 24-48 hours to acclimate to temperature and humidity. This prevents expansion/contraction after install.

3

Install Underlayment

Roll out foam underlayment (if not pre-attached), overlapping seams by 2 inches. Tape seams with tape.

4

Plan the Layout

Measure the room width and calculate if the last row will be too narrow (under 2 inches). If so, trim the first row to balance the layout.

5

Start the First Row

Place spacers along starting walls for a 1/4-inch expansion gap. Click planks together end to end. Keep the tongue facing out for the next row.

6

Install Subsequent Rows

Stagger end joints by at least 6 inches. Angle planks at 30° to click the long side, then press down. Use a tapping block to close end joints.

7

Cut Around Obstacles

Use a jigsaw to cut around door casings, vents, and other obstacles. Undercut door casings so the floor slides underneath.

8

Finish with Trim

Remove spacers. Install quarter-round or shoe molding to cover the expansion gap. Do not nail molding to the floor — only to the baseboard.

© 2026 FixLogik. All rights reserved.

Unauthorized use, copying, or reproduction is strictly prohibited.

base44
Edit with Base44