Intermediate
Wood_floors

Flooring Installation

Complete guide to installing various types of flooring including hardwood, laminate, and tile.

2-5 days
8 steps

Tools Needed

Tape measureMiter sawFlooring nailerRubber malletSpacersLevelPull bar

Find Materials Near You

Tap a store to find the nearest location on Google Maps.

Instructions

1

Prepare the Subfloor

Remove existing flooring and check the subfloor for squeaks, soft spots, and level. Sand high spots and fill low areas.

2

Acclimate the Flooring

Let hardwood or laminate planks sit in the room for 48-72 hours to acclimate to temperature and humidity.

3

Install Underlayment

Roll out foam underlayment across the subfloor, taping seams. This provides cushion and moisture barrier.

4

Plan Your Layout

Snap a chalk line parallel to the longest wall. Dry-lay the first few rows to plan cuts and ensure a balanced look.

5

Install First Rows

Start along the longest wall with spacers against the wall. Nail or click-lock planks per manufacturer instructions, staggering end joints.

6

Continue Across the Room

Work row by row, tapping planks together firmly. Cut end pieces with a miter saw as needed.

7

Install Transition Strips

At doorways and room transitions, install appropriate transition moldings.

8

Install Baseboards

Remove spacers, install shoe molding or baseboards to cover expansion gap around the perimeter.

© 2026 FixLogik. All rights reserved.

Unauthorized use, copying, or reproduction is strictly prohibited.

base44
Edit with Base44